Some rule 1s
Old place
The shed was essentially a utility room - fridge, washing machine and tumble dryer. I live in a ground floor flat, back garden is shared, anything right of the shed belongs to her upstairs but she doesn't look after it. Since the fence blew down last winter I've kind of taken over the her side of the garden.

Cleared away stone patio and begun hand digging foundations

Shed had to stay temporarily until I came up with alternative arrangements for the washing machine and freezer

So I rerouted the electrics and plumbing to a plastic bin stores, put the washing machine and freezer there will work carries of.
Shed dismantled

Foundations poured - 4 tonne of concrete wheelbarrowed in from the front and mixed by myself in one pour - hard days graft this one

Footings laid

Ground membrane and insulation


Floor poured - 5 tonne of gravel wheeled in and mixed in situ Serious Days Graft that day.
Blocking commenced